First photographs of the Construction Work on the new Yokohama Masonic Temple have been posted.
The site is bounded on both east and west sides with breeze block walls belonging to the neighbors. To prevent damage to these walls during excavation of the foundations, steel girder piling has been sunk to a depth of 5 meters. Buried concrete rubble has also been removed and the site is now ready for the next stage of construction.